Raw material receiving
Acceptance criteria, internal codes, and rejections with their reason.
Paperless records, instant alerts, and every lot ready for the audit.
GMP modules
meetings and you're up and running
to build the lot file
paper forms
Low chlorine is found days later.
Anything out of limits triggers an alert right away.
Every raw material, checked and tied to its supplier.
Each lot carries what it used.
Out of limits, the lot goes on hold.
Every box, linked to its lot.
Acceptance criteria, internal codes, and rejections with their reason.
Spec sheets and documents with expiry dates. You're warned before they lapse.
Orders, process steps, and each lot with its raw materials.
Limits per point, on-the-spot records, and automatic holds.
Master plan by area and equipment, with who did it and when.
pH and chlorine by tap and by day, with the range and corrective action.
Thermometers, scales and instruments with their status each day.
What went wrong, the corrective action and its close-out, without losing track.
Vehicle and staff checks, with every box linked to its lot.
One step back and one step forward, with the lot's mass balance.
Calculated from official sources, with the rounding and serving sizes of Res. 810.
Your usual forms, filled in with the month's records.
PT-279-302| Mass balance | In 1,250 kg · out 1,238 kg | Balanced |
| Raw materials | 3 · approved suppliers | Current |
| CCP frying | 6 records · 174 to 178 °C | Within limits |
| Calibration TT-02 | Passed Oct 29, 2026 | Passed |
| Shipments | 2 · no returns | Closed |
No. Your forms become screens for logging records, and at the end of the month you download them in the same Word files your engineer made, with their codes, layout and your plant's logo, filled in with the records.
Foodie runs in the browser on a tablet, phone or computer. If your plant already has one of those, you can start with it.
Only the people you authorize, each with permissions by module. Every record is saved with who made it and when, and it can't be deleted or quietly changed.
No. It takes chasing forms off their plate and leaves the information organized for what really matters: deciding and improving.
We build a plan around the modules you need and how many people will use it at each plant. Write to us and we'll show you in a demo.
Five meetings, from kickoff to one week after your first production run with Foodie.